change control rollback

This policy defines a Change Control Rollback policy to be followed consistently across participating centers. This policy applies to scheduled system changes that impact the user experience. These scheduled system changes will include a recovery plan, outlined in advance of the change, in case the change is determined to be unsuccessful and rollback to a previous configuration is necessary.

  1. Each Center will have a Contingency/Recovery Plan for rollback to a previous configuration prior to making hardware or software changes.
  2. Each center will utilize any applicable Test and Development System or other non-production system to test changes prior to implementation. To the extent feasible, appropriate test methods that represent daily system workload should be used to enhance risk mitigation of adverse consequences of changes.
  3. 3. Customer assistance staff will have access to a description of the scheduled system changes to facilitate identification of problems encountered by users following hardware/software changes.

US Air Force Research Laboratory DSRC US Army Research Laboratory DSRC US Army Engineer Research and Development Center DSRC Maui High Performance Computing Center DSRC Navy DSRC at Stennis Space Center Open Research Systems

Contact the Webmaster

Privacy & Security Notice

The appearance of hyperlinks does not constitute endorsement by the U.S. Air Force of this website or the information, products, or services contained therein. For other than authorized activities such as military exchanges and morale, welfare and recreation sites, the U.S. Air Force does not exercise any editorial control over the information you may find at these locations. Such links are provided consistent with the stated purpose of this DoD website.